Statistical Yearbook 2007 available soon!
New UCTE Grid Map available Reworked Website with new Data Handling section TSOs for electricity are founding new association
Terms of the UCTE database Explanation
| Domestic values | ||
|
country_ID |
Abbreviation of country |
Info |
|
month & year |
Month and Year |
|
|
prod_hy |
Hydro power production (GWh) |
Info |
|
prod_tn |
Nuclear power production (GWh) |
Info |
|
prod_tc |
Conventional thermal power production (GWh) |
Info |
|
=> of which lignite* |
of which lignite (GWh) |
Info |
|
=> of which hard coal* |
of which hard coal (GWh) |
Info |
|
=> of which gas* |
of which gas (GWh) |
Info |
|
=> of which oil* |
of which oil (GWh) |
Info |
|
=> of which not attributable* |
of which not attributable (GWh) |
Info |
|
prod_other_renew* |
Renewable power production (GWh) |
Info |
|
=> of which wind* |
of which wind (GWh) |
Info |
|
prod_not_clearly* |
Not clearly identifiable production (GWh) |
Info |
|
industrial |
Deliveries from industry included |
|
|
prod_repr |
Representativity as percentage of total production values (%) |
Info |
|
_hy_repr* |
Hydro power production representativity (%) |
Info |
|
_tn_repr* |
Nuclear power production representativity (%) |
Info |
|
_tc_repr* |
Conventional thermal power production representativity (%) |
Info |
|
_other_renew_repr* |
Renewable power production representativity (%) |
Info |
|
_not_clearly_repr* |
Not clearly identifiable production representativity (%) |
Info |
|
exg_saldo |
Exchange balance (GWh) |
Info |
|
pump |
Consumption of pumps (GWh) |
Info |
|
cons_repr |
Representativity as percentage of total consumption values (%) |
Info |
|
cons_load_repr |
Representativity as percentage of total load values (%) |
Info |
|
cons_load_peak |
Peak load on the 3rd Wednesday (MW) |
Info |
|
egy_cap |
Energy capability (GWh) |
Info |
|
mean_egy_cap |
Mean energy capability (GWh) |
Info |
|
* Data available since 01.01.2005 |
|
|
| Exchange values |
|
|
|
Country_ID |
Exporting country |
Info |
|
Ct_imp |
Importing country |
Info |
|
Value |
Value in GWh (energy) or MW (load) |
Info |
|
day |
Date of 3rd Wednesday |
|
| Maximum output capacities on December 31 (MW) |
|
Info |
|
hy |
Hydro power |
|
|
tc |
Thermal conventional |
|
|
tn |
Thermal nuclear |
|
|
regen |
Renewables |
|
|
others |
Other sources |
|
|
repr |
Representativity as percentage of total values (%) |
Info |
| Network components |
|
|
|
cir_len_220 |
Length of circuits 220kV (km) |
Info |
|
cab_len_220 |
Length of cables 220kV (km) |
Info |
|
cir_len_400 |
Length of circuits 400kV (km) |
Info |
|
cab_len_400 |
Length of cables 400kV (km) |
Info |
|
nbr_ps_trf_220 |
Number of power station transformers 220kV -> <220kV |
|
|
cap_ps_trf_220 |
Capacity of power station transformers 220 kV -> <220kV (GW) |
|
|
nbr_net_trf_220 |
Number of network transformers 220kV -> <220kV |
|
|
cap_net_trf_220 |
Capacity of network transformers 220 kV -> <220kV (GW) |
|
|
nbr_net_trf_400_220 |
Number of power station transformers 400kV -> <220kV |
|
|
cap_net_trf_400_220 |
Capacity of power station transformers 400kV -> <220kV (GW) |
|
|
nbr_ps_trf_400 |
Number of network transformers 400kV -> <220kV |
|
|
cap_ps_trf_400 |
Capacity of network transformers 400 kV -> <220kV (GW) |
|
|
nbr_net_trf_400 |
Number of network transformers 400kV -> 220kV |
|
|
cap_net_trf_400 |
Capacity of network transformers 400 kV -> 220kV (GW) |
|


sitemap | imprint | disclaimer | extranet
UCTE | 15 Boulevard Saint-Michel | 1040 Brussels | Belgium
Company Form: AISBL | Reg. nr.: 21262002 | VAT: none
IBAN: BE90310165874332 | BIC: BBRUBEBB
www.ucte.org
Last changes: 2008-11-02