UCTE

UCTE  >  Resources  >  Publications  >  other reports

Other Reports

Other Reports

2009

2009

UCTE Transmission Development Plan
new Report  

Requirements to generating units
new Report  

UCTE Frequency Investigation Report
new Report  

 

2008

2008

UCTE Transmission Development Plan
Report  

 

2007

2007

Winter Outlook Report 2007-2008
Report  

UCTE data exchange format for load flow and three phase short circuit studies – Report (updated) and Description of x-nodes
Report  
Description of x-nodes  

Compliance Monitoring Program 2007
Compliance Monitoring Program 2007  

European, CIS and Mediterranean Interconnection - joint UCTE and Eurelectric report: Main part & Annexes
Main part & Annexes  

Final Report of the first phase of the European Wind Integration Study (EWIS)
EWIS Report  

Final Report on the disturbances of 4 November 2006 presentation and report
Presentation  
Report  

 

2006

2006

UCTE compliance monitoring progr. 2006
Compliance oversight report  

Interim Report - System Disturbance on 4 November 2006
Interim Report  

Winter Outlook Report 2006 - 2007
Winter Outlook Report 2006 - 2007  

Geographical Distribution of Reserves - UCTE technical document
Geographical Distribution of Reserves  

 

2005

2005

-

 

2004

2004

Wind power in the UCTE interconnected system
Wind power in the UCTE interconnected system  

Measures to safeguard security of electricity supply and infrastructure investment : presentation of President Martin Fuchs
Presentation  

UCTE presentations from Florence Forum
Compliance Monitoring and Enforcement Process  
Multilateral Agreement  
Operation Handbook  

UCTE position on EU proposal of the Directive on "Security of Supply"
Position paper  

UCTE comments on background paper undergrounding of electricity lines in Europe
Position paper  

UCTE position on integrating wind power in the European power system
Position paper  

Final Report of the Investigation Committee on the 28 September 2003 Blackout in Italy
Final Report  

 

2003

2003

Interim Report of the Investigation Committee on the 28 September 2003 Blackout in Italy
Interim Repor  

Load-flow analysis with respect to a possible synchronous interconnection of networks of UCTE and IPS/UPS
Report  
Annexes  
Presentation  

 

2002 and earlier

2002 and earlier

European Interconnection: State of the Art 2002
Report  

Methodology of Power Balance 2002
Report  

Methodology of the Power Balance (System Adequacy)
Methodology of the Power Balance  

 

 

 

Half Yearly Reports

 

Production of Half-Yearly Reports has been stopped in 2005. All relevant information can be found in Statistical Yearbooks, System Adequacy Reports and Monthly Statistics.

 

HYR 2005/1  

HYR 2004/2  
HYR 2004/1  

HYR 2003/2  
HYR 2003/1  

HYR 2002/2  
HYR 2002/1  

HYR 2001/2  
HYR 2001/1  

HYR 2000/2  
HYR 2000/1  

 

Newsgrid

 

Newsgrid 18 | 2006/4  
Newsgrid 17 | 2006/3  
Newsgrid 16 | 2006/2  
Newsgrid 15 | 2006/1  

Newsgrid 14 | 2005/4  
Newsgrid 13 | 2005/3  
Newsgrid 12 | 2005/2  
Newsgrid 11 | 2005/1  

Newsgrid 10 | 2004/4  
Newsgrid 09 | 2004/3  
Newsgrid 08 | 2004/2  
Newsgrid 07 | 2004/1  

Newsgrid 06 | 2003/4  
Newsgrid 05 | 2003/3  
Newsgrid 04 | 2003/2  
Newsgrid 03 | 2003/1  

Newsgrid 02 | 2002/2  
Newsgrid 01 | 2002/1  

 

The UCTE publications may either be downloaded or ordered as print version from the UCTE secretariat via our order form  

top of page  

sitemap  |  imprint  |  disclaimer  |  extranet

UCTE  |  15 Boulevard Saint-Michel  |  1040 Brussels  |  Belgium
Company Form: AISBL  |  Reg. nr.: 21262002  |  VAT: none
IBAN: BE90310165874332  |  BIC: BBRUBEBB
www.ucte.org
Last changes: 2009-05-29